Prefab breathable eco houses delivered across Europe
Built in Bulgaria Delivered & installed in Europe Predictable price & timeline
Small Homes
30–70m²
Delivery time
One / Two months
+
Building application process
+
Building application process
Family Homes
80–140m²
Delivery time
Two / Three months
+
Building application process
Custom Projects
+ 100m²
Delivery time
+ Two months
+
Building application process
+
Building application process
Sorvan Packages Comparison Table
| Feature | Sorvan Essential | Sorvan Signature | Sorvan Prestige |
|---|---|---|---|
| Eco-friendly house | ✅ Yes | ✅ Yes | ✅ Yes |
| Energy efficiency level | Standard (lower efficiency) | High energy efficiency | Highest / customized performance |
| Wall & floor materials | Basic materials | Higher quality materials | Premium custom materials |
| Interior wall finish | No plastering / basic finish | High-quality surface finish | Highest finish quality (custom) |
| Kitchen | Basic kitchen | Designer kitchen | Fully custom-made kitchen |
| Bathroom | Basic bathroom | Designer bathroom | Fully custom-made bathroom |
| Bathroom furniture | Basic | ✅ Upgraded designer fixtures | ✅ Included (premium/custom) |
| Kitchen fixtures | Basic | ✅ Upgraded designer fixtures | ✅ Premium fixtures (custom) |
| Built-in furniture | Not included | Some built-in furniture included | Fully custom built-in furniture |
| Floor heating pipes | ✅ Included | ✅ Included | ✅ Included |
| Heating unit included | ❌ Not included | ✅ Included with the module | ✅ Included (premium/custom) |
| Best for | Budget-friendly eco living | Best value + premium finish | Luxury + fully tailored solution |
Why Sorvan prefab
Factory quality control
Scandinavian design
Eco wall system
Fast installation
EU delivery process
✅ Breathable Eco House vs Normal Airtight House
| Topic | Normal Airtight House | Breathable Eco House (Diffusion-Open) |
|---|---|---|
| Main idea | House is sealed to stop air leaks and reduce energy loss | Walls are diffusion-open so moisture can move safely through layers |
| Airtightness | ✅ Airtight (in theory) | ✅ Airtight (still required) |
| Energy efficiency | ✅ Very good | ✅ Very good (when airtightness is done correctly) |
| Drafts / comfort | ✅ Less drafts | ✅ Less drafts + more natural indoor comfort |
| Indoor air quality | ⚠️ Depends strongly on ventilation system | ✅ More forgiving, healthier indoor climate |
| Humidity control | ⚠️ Can build up if ventilation is not perfect | ✅ Walls help regulate moisture naturally |
| Condensation risk | ⚠️ Higher risk inside construction if moisture gets trapped | ✅ Much lower risk — moisture can dry out |
| Mold & hidden damage risk | ⚠️ Higher risk (wet insulation, mold, wood rot possible) | ✅ Lower risk (better drying and moisture buffering) |
| Ventilation dependency | ❗ High — mechanical ventilation must work correctly | ✅ Still needed, but system is more forgiving |
| Feeling inside the home | “Warm, but sealed” | “Warm, fresh, natural” |
| Summer performance | ⚠️ Can overheat more easily | ✅ Better heat delay → cooler longer |
| Materials | Often synthetic (EPS, foils, sealed layers) | Eco/breathable (wood fibre, cellulose, breathable membranes) |
| Construction difficulty | Easier and more common | Requires correct detailing and materials (no shortcuts) |