Stubbegårdsparken 131
By
Sorvan

Revit Model

Architectural drawings

Kitchen

Materia that we have piked

K7045 Satin AM
K023 Venato SU

Payment overview

Technical drawings ​

Work photos

It will be updated soon with more pictures

Material Keneth house

 

Price – 618.145 + 154.536 Vat = 772.681 kr. – 103.700 euro

I got – 256.000 + 64.000 Vat = 320.000 kr. –  43.300 euro

I Have left – 452.681 – 60.800 euro

What I need to spend – 329.992kr. – 44 .170 euro

Buffer of 124.242 kr. – 16.630 euro


Foundation –  83.864 kr. – 11.260 euro

General / foundation materials

  • Concrete – 5 m³
  • RC BETON Scan Blok, 19 cm x 33 cm x 49 cm – 208 pcs + adhesive/glue
  • RAW plywood (packaging grade), 9 mm x 1220 x 2440 mm – 10 pcs
  • RAW roof battens C18 BDT, 38 x 73 mm, 4200 mm – 20 pcs

Concrete slab materials

  • RAW stabilgrus (sub-base gravel) BigBag 0–32 mm, 500 L – 10 pcs
  • RAW EPS RE80 floor insulation boards, 150 mm, 600 x 1200 mm – 180 pcs
  • ALPHA moisture & radon barrier, 2 m x 40 m – 2 rolls
  • Concrete – 13 m³

 

Wall –   25.570 kr.  – 3.432 euro

If we what this wood I need 1000 euro on top of the budget.

Thermowood * 19 x 4.200 x 188

 

Roof –  36.010  – 4.820 euro

Roof membrane – Мембрана Metalik 450gr/m2

Roof tape – Мембрана Dupont Tyvek Hosewrap

Metal roof plates and parts – 16 euro per m2 – 120 m2  – 2000 euro

Osb plates

 

 

Bathroom – 29.884 kr. – 4.000 euro

Sink, toilets, shower, wall plates, boiler and more.   

 

Kitchen – 29.884 kr. – 4.000 euro

Cabinets and appliances

 

Floor heating  29.884 kr. – 4.000 euro

Pump and pipes

 

Windows  – 22.413 kr –  3.000 euro

What’s left to pay

 

Transport – 37.355 kr. – 5.000 euro

Bulgaria / Denmark

 

Connection fees – 35 000 kr. – 4.685 euro

Water and EL

Finishing materials

 

Floor – 40.000 kr.

Natural wood floor in living room corridor

Laminate floor in sleeping room

 

Walls finish –  10.000kr.

Plywood – the price of materials have gone up so I need 5.000 kr. more

 

Ceilings  – 20.000 kr.

TROLDTEKT all house

Plywood
TROLDTEKT

Paymentplan

 

Payment
1 – 20  000 kr. February – 16 – 20

For small stuff

 

Payment 2 – 130 000kr. March – 02 – 06, if we can do it before if will be perfect.

Forpluming

Walls

Roof

Windows

Kitchen

 

Payment 3 – 155 000 kr. End of march beginning of April Depending on the weather

Transportation

Foundation

Connection
fees

 

Payment 4
– End of march we will decide it when I’m in Denmark

Finishing
materials

 

Payment 5
–  around 145 000 – When the house is finished 

SORVAN DESIGN

Project Dashboard

Stubbegårdsparken 131 • 4900 Nakskov

In Progress Dec 14, 2025 – May 31, 2026

TOTAL BUDGET

772,681

DKK incl. VAT

INVOICED

465,821

DKK (60.3%)

REMAINING

306,860

DKK to invoice

HOURS

1,307

of ~2,000 estimated

TIMELINE

61%

102 of 168 days elapsed

Project Timeline

Dec 14, 2025 — Project Start

Construction begins in Bulgaria. 2-person crew on site daily.

Feb 12, 2026 — STARK Materials Offer

First STARK offer received (83,864 DKK). Foundation materials quoted.

Feb 16–20 — Payment 1 (20,000 DKK)

Small materials purchased.

Mar 2–6 — Payment 2 (130,000 DKK)

Major materials: plumbing, walls, roof, windows, kitchen.

Mar 25, 2026 — Current

1,307 hours logged. Preparing for foundation phase.

Apr 13, 2026 — Foundation Start

On-site foundation work begins in Nakskov. STARK delivery coordinated.

Late Apr — Payment 3 (155,000 DKK)

Transport, foundation, connection fees.

May 2026 — Assembly & Finishing

House assembly on foundation. Interior finishing begins.

May 31, 2026 — Target Completion

Final inspection. Payment 5 (~145,000 DKK) upon handover.

Timeline Progress

Timeline
61% (102/168 days)
Hours
65% (1,307/2,000 hrs)
Budget
60% invoiced (465,821/772,681)

Hours vs Estimate

Hours Logged

PeriodHours
Dec 2025 (from 14th)~216
Jan 2026~372
Feb 2026~336
Mar 2026 (to 25th)~383
Total1,307 hrs

Projection

Estimated total: ~2,000 hrs

Completed: 1,307 hrs (65%)

Remaining: ~693 hrs

Days left: 67 days

Avg needed/day: ~10.3 hrs/day

On track. Current pace (~12.8 hrs/day) exceeds required rate (~10.3 hrs/day).

Financial Overview

Total Contract

772,681 DKK

Invoiced to Date

465,821 DKK

Remaining

306,860 DKK

Invoices

#DKKEURStatus
1919,862403Paid
20158,6563,216Paid
2499,0912,009Paid
2619,817402Paid
2719,817402Paid
2919,817402Paid
30128,7612,610Paid
Total465,8219,443

Cost Breakdown

Materials & Construction

~420,000 DKK

Labour (Bulgaria)

~180,000 DKK

Transport & Logistics

~90,000 DKK

Foundation (DK)

~83,864 DKK

Payment Plan

Payment 1 – 20,000 DKK

Feb 16-20 – Small materials

Done

Payment 2 – 130,000 DKK

Mar 2-6 – Plumbing, walls, roof, windows

Done

Payment 3 – 155,000 DKK

End Mar / Apr – Transport, foundation, connections

Upcoming

Payment 4 – TBD

Decided on-site in Denmark

Pending

Payment 5 – ~145,000 DKK

When house is finished

Pending

Materials Selected

K7045 Satin AMKitchen Countertop
K023 Venato SUKitchen Backsplash
Grohe Vitalio 250Shower System
Geberit Sigma30Flush Plate
Velfac 200Windows & Doors
Rockwool FlexibattsInsulation

Last updated: March 25, 2026 • Sorvan Design